G3, Rycroft, AB

Submitted: May 2023

CEL is privileged to be part of creating another grain elevator for G3, this one in Rycroft, AB. The new elevator will have a capacity of 42,000 tonnes of grain. It includes a loop track that can load a 150-car unit train and the ability to unload a Super-B truck in less than five minutes!

CEL’s strategically located branches, skilled teams, and standardized procedures allowed us to assure the same high standards at each construction site. Rycroft is a collaboration between 3 CEL offices, Saskatoon, Camrose and Calgary. Our team did a great job of keeping with the clients aggressive completion timeline while maintaining good safety performance from all the crew!

A very special thanks to Lee S., Sean M., Travis V., Shane O., Dylan H., Johnny H. and Ches R.!!

G3 Grain Elevator in Rycroft, AB